Improved design, installation and commissioning practices lead to a dramatic improvement in building energy consumption, indoor air quality, and comfort. There are six performance factors that can be applied to HVAC design, installation and/or commissioning. In the Optimizing Residential Forced-Air series, we will review how each factor can be specified at design, implemented during installation, and tested/adjusted during commissioning. We will also look at how we can redesign our approach to high performance HVAC systems to support CA climate goals, help manage the peak electrical load on the grid as well as the owners operating cost under the time-of-use billing structure.
The Optimizing Residential Forced-Air series is informed through commissioned systems, where real examples from completed projects are used to support class content. We have designed, built, and commissioned both retrofit and new construction projects that exemplify the concepts covered in class. Course content will include design examples, photos installations, and test results from commissioning.
The HVAC equipment, materials and knowledge required to dramatically improve the performance of HVAC systems is readily available. This class will assist the designer, installer, and rater in their efforts to improve the HVAC systems we build.
Dan Perunko
Dan Perunko is cofounder of Balance Point Home Performance Company. In 2006, along with Gavin Healy, Dan started a successful company providing full service home performance analysis, retrofits, consultations, and trainings. Dan works on new and existing construction designs and hands on installations of enclosures, mechanical, plumbing, and indoor air quality components based on tested performance outcomes. Dan especially enjoys improving existing homes to provide homeowners with levels of comfort and energy consumption that they have not believed possible. Dan is a professional trainer who designs and delivers full and multi day courses for California’s utility companies (energy training centers) and ACI national and regional conferences. Dan brings his experience from construction, design and building analysis, to make his class materials relevant, useful and understandable regardless of the attendees’ level of experience.
Agenda:
Duct Leakage
Duct Conduction
System Airflow
System Capacity
The objective of this course is that at the conclusion, participants will be able to: